How Long Does the Average Bathroom Renovation Take?

Understanding the Bathroom Renovation Timeline

A full bathroom renovation typically takes 4 weeks from demolition to completion. The timeline can vary depending on the complexity of the design, material availability, and any unexpected issues. At Custom Bathroom Creations, we work efficiently to deliver high-quality renovations with minimal delays.

Here’s a step-by-step breakdown of what to expect.

Pre-Renovation Phase (1-4 Weeks Before Work Begins)

Before the renovation starts, several key steps must be completed:

  • Quote & Approval (1-2 weeks): Once you receive a detailed quote, you’ll need to approve the project and finalise your budget.
  • Design & Material Selection (1-3 weeks): Choosing tiles, fixtures, and fittings early helps prevent delays.
  • Scheduling & Ordering (1-4 weeks): Materials must be ordered, and trades scheduled before work begins.

Week 1: Demolition & Preparation

The renovation officially starts with demolition and preparation, which includes:
✔ Removing old tiles, vanities, showers, and fixtures
✔ Checking for water damage or structural issues
✔ Preparing the space for plumbing and electrical work

Timeframe: 2-3 days.

Plumbing & Electrical Rough-In

✔ Installing new pipes and drainage
✔ Wiring for lighting, power points, and exhaust fans

Timeframe: 2-3 days.

Week 2: Waterproofing & Tiling

✔ Applying waterproofing membranes to protect against leaks
✔ Laying new floor and wall tiles

Timeframe: 5-7 days (including drying time).

Week 3: Installing Fixtures & Fittings

Once the foundation is set, it’s time to install:
✔ Vanities, tapware, and toilets
✔ Showers, bathtubs, and mirrors
✔ Lighting, exhaust fans, and accessories

Timeframe: 4-5 days.

Week 4: Finishing Touches & Handover

The final stage involves:
✔ Sealing, grouting, and final paint touch-ups
✔ Thorough cleaning and quality checks
✔ Final walkthrough to ensure everything meets expectations

Timeframe: 3-4 days.

Factors That Can Impact the Timeline

Several factors may affect how long your renovation takes:
Custom Features – Custom cabinetry or intricate tiling can add extra time.
Material Delays – Supplier shortages may extend lead times.
Unexpected Repairs – Structural or water damage may require additional work.

How to Keep Your Renovation on Track

Plan Ahead: Finalising selections early avoids hold-ups.
Work with Experts: An experienced team ensures smooth coordination.
Be Flexible: A little buffer time helps manage unforeseen delays.