Understanding Milestones: Demolition, Waterproofing, and Fit-Off

Breaking Down the Key Stages of Your Bathroom Renovation

Every bathroom renovation follows a structured process with three major milestones: demolition, waterproofing, and fit-off. These stages are critical to ensuring a high-quality, long-lasting finish. Understanding what happens at each step will help you stay informed and prepared throughout your renovation.


Milestone 1: Demolition – Clearing the Space

What happens?
🔨 Removal of old tiles, vanity, shower, toilet, and fittings
🛠 Checking for hidden issues like water damage, mould, or plumbing faults
📏 Preparing floors and walls for new installations

How long does it take?
✔ Typically 2–3 days, but may take longer if unexpected repairs are needed

🚧 What to expect?
Noise & dust – Demolition is the loudest part of the process
Temporary bathroom setup needed – Your bathroom will be completely out of use
Potential surprises – Older homes may have hidden damage that needs fixing before moving forward

Tip: If additional repairs are required, it’s best to address them now to avoid problems later.


Milestone 2: Waterproofing – Protecting Your Bathroom

What happens?
🚰 Application of waterproofing membranes to prevent leaks and moisture damage
🛠 Multiple coats applied to floors, walls, and shower areas
🕐 Required drying time to ensure a watertight seal

How long does it take?
2–3 days, including drying time between coats

🚧 What to expect?
No walking on waterproofed areas until fully cured
Possible chemical odours from waterproofing products
Strict quality control – This step ensures compliance with Australian building codes

Tip: Waterproofing is one of the most important steps in the renovation—cutting corners here can lead to costly water damage down the track.


Milestone 3: Fit-Off – The Final Installations

What happens?
🔩 Installation of vanities, mirrors, tapware, and accessories
🚽 Fitting toilets, showers, and bathtubs
💡 Installing lighting, exhaust fans, and heated towel rails

How long does it take?
3–5 days, depending on the complexity of the fittings

🚧 What to expect?
Tradespeople coming in and out to complete final plumbing and electrical connections
Final inspections to ensure everything is working correctly
✔ Your bathroom fully functional and ready to use!

Tip: If you’re considering smart bathroom features, like heated towel rails or LED mirrors, this is the time to install them.


Final Thoughts: Why These Milestones Matter

Each of these key renovation stages is essential to creating a durable, stylish, and long-lasting bathroom. By understanding these milestones, you’ll know what to expect and how to prepare for each step.

At Custom Bathroom Creations, we focus on quality workmanship, expert waterproofing, and seamless fit-off to ensure your new bathroom stands the test of time.